AFCAP Use of road works to enhance community water supplies in Mozambique. Pre-Inception Report
Document Type:
Report
Document Status:
Open / Free access
Author:
Stange Consult
Publication Year:
2012
Link:
View PDF

3437 KB
Citation:
Stange Consult. AFCAP Use of road works to enhance community water supplies in Mozambique. Pre-Inception Report. (2012) 36 pp.
Regions:
 
Eastern Africa
Countries:
Mozambique
Summary:
Resettlement of communities alongside upgraded and rehabilitated primary, secondary and
tertiary roads has occurred throughout Mozambique. This has resulted in linear villages often
with no focal point spread over long distances and, except at designated growth points, often
lacking in basic utility services, especially water supply. Climate, relief, geology and soils
often exacerbate the precarious water supply situation with regard to both surface and underground
resources, which can result in low, unreliable and seasonal yields especially during
the dry season. It is recognised that road works can be used to enhance community water supplies either by
building structures that utilise the road to retain water or by utilising water that collects in
borrow pits from which road making materials have been extracted. Consequently, the objective of the assignment is to undertake research by initially identifying
and designing pilot projects whereby road works can be used to enhance community water
supplies on a larger scale in Mozambique. This report is the Pre-Inception Report covering activities carried out by the
Consultant in the period 11th October to 10th November 2012